| |
v
Shenley
Court School
Three storey steel framed Senior School extension. The structure being of a steel frame supporting pre-cast concrete floor units, with a glazed link to the existing building.
| CLIENT:
|
City of Birmingham |
| CONTRACTOR: |
Chase Norton Construction (Design & Build) |
| ARCHITECT: |
ABACUS |
|
CONTRACT
VALUE: |
£0.75 million |
|